Apex Bridge Replacement

Iqaluit, Nunavut

Project Type

  • Road Works
  • Infrastructure
  • Civil Construction

Timeline

2024 

Client

City of Iqaluit

Project Details

  • Prefabricated Bridge  
  • 2 lanes 
  • 120 Foot Length 
  • Pedestrian Walkway 

Services

  • Crane Services 
  • Concrete 
  • General Contracting 
  • Lifting Plans/Rigging  

Proven Performance

Tower Arctic was the successful bidder on the tender to replace the ageing bridge to Apex in 2024. The project consisted of the removal and dismantling of the existing bailey bridge, design and construction of new concrete and earthwork abutments, and the installation of a new modular baily bridge. This new construction allowed the bridge to be expanded from a single lane to 2 lanes with an attached pedestrian walkway. Tower Arctic expertise in northern logistics and construction allowed the new bridge to be designed, built, shipped and installed less than 6 months after the tender close.  

For more information about the Apex Bridge Replacement project or to learn more about Tower Arctic Ltd.’s comprehensive range of services, please don’t hesitate to contact us. We are here to support your infrastructure needs and help build a brighter future for communities across the North.

Back To Top