Apex Bridge Replacement
Iqaluit, Nunavut
Project Type
- Road Works
- Infrastructure
- Civil Construction
Timeline
2024
Client
City of Iqaluit
Project Details
- Prefabricated Bridge
- 2 lanes
- 120 Foot Length
- Pedestrian Walkway
Services
- Crane Services
- Concrete
- General Contracting
- Lifting Plans/Rigging
Proven Performance
Tower Arctic was the successful bidder on the tender to replace the ageing bridge to Apex in 2024. The project consisted of the removal and dismantling of the existing bailey bridge, design and construction of new concrete and earthwork abutments, and the installation of a new modular baily bridge. This new construction allowed the bridge to be expanded from a single lane to 2 lanes with an attached pedestrian walkway. Tower Arctic expertise in northern logistics and construction allowed the new bridge to be designed, built, shipped and installed less than 6 months after the tender close.
For more information about the Apex Bridge Replacement project or to learn more about Tower Arctic Ltd.’s comprehensive range of services, please don’t hesitate to contact us. We are here to support your infrastructure needs and help build a brighter future for communities across the North.