Airside Surfaces Rehabilitation 

Clyde River, Nunavut 

Project Type

  • Civil Construction
  • Transport Infrastructure

Timeline

2018 2020 

Client

Government of Nunavut 

Project Details

  • Gravel runway   
  • 1,067m Length 
  • 30m Width 
  • 18,000m3 of aggregate 

Services

  • Blasting and Crushing Services 
  • General Contracting 
  • Aggregate Placement 
  • Ditching 

Proven Performance

Tower Arctic was the successful bidder on the tender to rehabilitate the runway in Clyde River. The project consisted of the production of aggregate base material, hauling and stockpiling of aggregate base material, scarification of existing airfield surfaces, placement grading and compaction of granular base material on existing airfield surfaces and adjustment of existing threshold lighting and edge lighting heights.  

We extend our heartfelt gratitude to all partners and team members who contributed to the success of this project. Their collaboration, expertise, and dedication were instrumental in bringing this vision to life. As we celebrate this achievement, we look forward to the lasting positive impact it will have on Clyde River.

For more information about the Airside Surfaces Rehabilitation project or to learn more about Tower Arctic Ltd.’s comprehensive range of services, please don’t hesitate to contact us. We are here to support your infrastructure needs and help build a brighter future for communities across the North.

Back To Top